|
HEB was engaged
by the Town of Alexandria to perform a preliminary engineering
report for replacement of the 26' span Berry Road Bridge over the
Smith River. HEB performed on-site survey and borings to determine
the condition of the structural members and prepared a study of
alternatives. After acceptance of the report, HEB was engaged to
design the replacement bridge. |