HEB
North Conway, NH - 603.356.6936
   

Steele Road Bridge

HEB was engaged by the Town of Thornton to design a replacement bridge on Steele Road. The original bridge, a steel through truss constructed in 1907, spanned 43 feet over the Mill Brook. The new bridge is 48’ long and has cast-in-place concrete abutments, steel stringers, and glu-lam deck, curbs and rails. HEB's services included survey, borings, engineering study, design, and construction administration. Winterset, Inc. of Lyndonville, Vermont was the general contractor.