|
The
Town of Conway, NH engaged HEB to inspect the existing
condition of this bridge and provide a repair cost estimate for capital planning purposes.
HEB was subsequently hired to design the replacement bridge. Services included preliminary
design, permitting hydrology, profile, final design and construction administration. |